10 Steps of Fiberglass pool installation.

Fiberglass pools might seem to be the simplest kind of pool to install. Normally, fiberglass pools Take 5 to 10 days to Install, depending on size, model and others variables.

Process of installing fiberglass pools.

Guide below:



Digging and site prep

1. Digging and site prep

This is the time to choose the best position of the pool in relation to the sun. The most suitable location is the highest, where rainwater does not seep into the pool. The first step is to mark the exact installation site of the pool. Dig the hole a foot larger than the outside of the pool and about 2 inches deeper than the pool depth.

2. Concreting the base for the pool

Start with leveling the base and pouring about 3 inches of concrete (rebar maybe necessary for unstable soils). Some installers make a 2 inches sand mattress between the floor and the pool, which is not wrong. However we advise placing the pool directly on the concrete base.
Concreting the base for the pool

2. Concreting the base for the pool

Start with leveling the base and pouring about 3 inches of concrete (rebar maybe necessary for unstable soils). Some installers make a 2 inches sand mattress between the floor and the pool, which is not wrong. However we advise placing the pool directly on the concrete base.
Pool delivery

3. Pool delivery

Your Fiber Pool arrives complete and ready to place in the hole.
To ensure that access is feasible, your installer will typically visit the site before installation to evaluate an access plan or path. Get a crane to lift the pool into place

4. Placement and leveling the pool

With the hole properly prepared and all measurements double checked, you ready to set the pool, make sure no dirt remains underneath. take your measurement at each corner of the pool again before adding water.
Placement and leveling the pool

4. Placement and leveling the pool

With the hole properly prepared and all measurements double checked, you ready to set the pool, make sure no dirt remains underneath. take your measurement at each corner of the pool again before adding water.
Bricks under the steps and seats

5. Bricks under the steps and seats

Use bricks under the steps and seats, fill all empty spaces.

6. Backfill

First of all Install the deep end suction fittings. Once the pool is set level, the process of adding water and backfill begins. The pool will be simultaneously filling with water while it is backfilled with gravel to provide equal pressure and stability on both sides of the fiberglass walls. It's important that the gravel on the outside and the water on the inside are brought up together to equalize the pressure. Make sure that pool levels are in perfectly place.
Backfill

6. Backfill

First of all Install the deep end suction fittings. Once the pool is set level, the process of adding water and backfill begins. The pool will be simultaneously filling with water while it is backfilled with gravel to provide equal pressure and stability on both sides of the fiberglass walls. It's important that the gravel on the outside and the water on the inside are brought up together to equalize the pressure. Make sure that pool levels are in perfectly place.
Plumbing

7. Plumbing

Install the fittings and the skimmer, Connect the PVC pipes from the fittings to the pump and filter.

8. Filtration system and eletrical installation

Position the pump and filter as near as possible to the pool.
Filtration system and eletrical installation

8. Filtration system and eletrical installation

Position the pump and filter as near as possible to the pool.
Pool deck preparation

9. Pool deck preparation

The deck surrounding your pool is beginning take shape.

10. Finishing the pool

Setting up the forms and pouring the concrete.
Finishing the pool

10. Finishing the pool

Setting up the forms and pouring the concrete.

Get creative! Now you have a beautiful design and quick installation of Fiber pools to suit any outdoor space.


LEARN MORE